DOT announces Big Island roadwork


The state Department of Transportation has announced the following Big Island roadwork for Monday, Jan. 14 through Friday, Jan. 18:

• On Volcano Highway (Route 11), lane shiftsin the northbound direction in the vicinity of the Keaau Bypass Road intersection between East Palai Street and Keaau-Pahoa Road, from 9 a.m. to 3:30 p.m. daily, for roadway reconstruction.

• On Volcano Highway (Route 11), alternating single-lane closures in both directions in the vicinity of Kulani Road between South Pszyk and Kukui Camp roads, from 8:30 a.m. to 3 p.m. daily, for roadway striping and traffic signal installation.

• On Hawaii Belt Road (Route 19), alternating lane closures in both directions between Kahawai and Hauola roads, in the vicinity of Kalopa, from 8:30 a.m. to 3 p.m. daily for guardrail installation.

• On Akoni Pule Highway (Route 270), alternating single-lane closures in both directions between Koko Iki Road and Ala Kahua Drive, in the vicinity of Mahukona, from 8:30 a.m. to 3 p.m. daily, for roadway resurfacing.

• On Mamalahoa Highway (Route 11) near Makalei, alternating single-lane closures in both directions between Hina Lani Street/North Kona Belt Road and Old Kona Village Road, from 8:30 a.m. to 3 p.m. daily, for roadway reconstruction work.

• On Mamalahoa Highway (Route 11), alternating lane closures in both directions between Haawina Street and St. Paul Road in the vicinity of Kainaliu, from 8:30 a.m. to 3 p.m. daily, for bank stabilization.

Lane closure schedules may change at any time without further notice. All roadwork is weather permitting.

 

Rules for posting comments